New Central Harbourfront Site 3 Phase 1

Man Yiu Street & Lung Wo Road, Central
Courtesy of China State Mechanical & Electrical Engineering Company Limited

Henderson Land’s vision for Central Harbourfront Site 3 is to create a world-class, future-defining commercial landmark.


The project pioneered the “MiMEP Plus” concept, which integrates MiMEP systems with ABWF (Architectural Builders Works & Finishes) elements—such as ceiling structures, fire partition walls and fire shutter tracks.

 

The project features over 3,500 modules, with single modules up to 12 meters long, achieving 93% coverage. For the retail areas, a standardised and interchangeable modular design was adopted. This not only enhances production efficiency but also provides the flexibility to changes in shop partitioning.


Furthermore, automation using drilling robots, AGVs, and synchronized lifting platforms replaces extensive manual labor, ensuring precise installation while enhancing site safety. This approach minimizes on-site procedures and trade conflicts, significantly boosting overall safety and efficiency.


In turn, the “MiMEP Plus” solution maximizes commercial net height and space utilization, directly improving the user experience and setting a new milestone for the industry.

Highlights on Current Status

Modules Manufacturing

Project Current Status

Under Construction

No. of MiMEP Modules

3,500

CFA (m²)

169,600

MiMEP CFA (m²)

28,013

Superstructure Storeys

17

MiMEP Storeys

17

MiMEP Area to CFA in Typical floors (%)

20

Construction Commencement Date

Jan 2024

Anticipated Date of Completion

Feb 2028

MiMEP Coverage (%)

93

Construction Commencement

Jan 2024

Manufacture of MiMEP Modules

In Phases

Installation of MiMEP Modules

In Phases

Anticipated Date of Completion

Feb 2028

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 15.10.2026 17:58:01

About MiMEP

Multi-trade Integrated Mechanical, Electrical and Plumbing (MiMEP) is the integration of multi-trade building services components, into a single volumetric assembly of prefabricated modules, manufactured off-site in a workshop, then transported to the site for connection of modules to complete various trades of building services installations to minimise on-site works. MiMEP can integrate with structural element, architectural builders’ works and finishes (ABWF) to form an advanced assembly, such as false ceiling unit and plant room unit to enhance the productivity.

About MiMEP