Lee Garden Eight comprises 90,000 sqm of new office space and 10,000 sqm of retail space. It features more than 6,000 sqm of public open space and various community and government facilities.


Its office design caters to future workplace trends. The floor plates are designed to offer the utmost flexibility for multi-tenancy and size-specific needs. The project embodies our dedication to the highest sustainability standards. During construction, numerous innovative methods, including MiMEP, are being employed.


This project is the first private commercial development in Hong Kong with over 85% MiMEP adoption. With such extensive MiMEP adoption, along with material upcycling and reuse, on-site waste is greatly reduced. This innovative method of construction also enhances the quality of the MiMEP module, installation efficiency, and site safety.


Lee Garden Eight sets a new benchmark for improving construction efficiency and quality to create a more sustainable future.

Courtesy of Hysan Development Company Limited

Highlights on Current Status

Modules Manufacturing

Project Current Status

Under Construction

No. of MiMEP Modules

7,409

CFA (m²)

173,457

MiMEP CFA (m²)

58,400

Superstructure Storeys

25;16

MiMEP Storeys

25;11

MiMEP Area to CFA in Typical floors (%)

55

Construction Commencement Date

Sep 2023

Anticipated Date of Completion

Q3 2026

MiMEP Coverage (%)

85

Construction Commencement

Sep 2023

Manufacture of MiMEP Modules

Aug 2024

Installation of MiMEP Modules

Sep 2024

Anticipated Date of Completion

Q3 2026

Module Type Description W (mm) L (mm) H (mm) Weight (kg) Qty
VAV Box
Module
Typical
Office
2200 5000 425 252 2879
MiMEP Module Podium 5800 2200 750 450 1108
MiMEP Module Basement 2400 5000 800 400 690
Riser Module_PD Plumbing & Drainage 1500 3000 300 250 270
Riser Module_FS Fire Services 1300 1300 200 233 38
Riser Module_EL Electrical 1000 3000 300 70 332
Riser Module_AC MVAC 4800 1910 400 750 110
Plant Room_PD Plumbing & Drainage 2000 2000 2000 1200 98

Plant Room_FS

Fire Services

1425

1250

1000

203

45

Plant Room_AC

Electrical

6350

2800

1400

929

314

Plant Room_EL

MVAC

1300

2000

400

100

748

Valves Set Module

Fire Services

1500

1000

200

50

49

Subsidiary Valve Modules

Fire Services

800

1490

600

150

87

Hose Reel Modules

Fire Services

400

750

1300

45

290

Water Meter Modules

Fire Services

1200

2400

600

71

6

Inlet Modules

Fire Services

550

1550

1300

163

28

Control Valve Modules

Fire Services

900

1950

800

114

6

FCU Module

MVAC

1500

1400

305

130

311

 

 

 

 

 

Total

7409

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 20.04.2026 16:49:58

About MiMEP

Multi-trade Integrated Mechanical, Electrical and Plumbing (MiMEP) is the integration of multi-trade building services components, into a single volumetric assembly of prefabricated modules, manufactured off-site in a workshop, then transported to the site for connection of modules to complete various trades of building services installations to minimise on-site works. MiMEP can integrate with structural element, architectural builders’ works and finishes (ABWF) to form an advanced assembly, such as false ceiling unit and plant room unit to enhance the productivity.

About MiMEP