The Nina Tower project showcases Hong Kong’s first Zero-Carbon chiller system, delivering 24/7 cooling across a 180,000 m² mixed-use development with a capacity of 9,300 RT. With over 50% of building energy used by MVAC, the innovative will reduce the electricity consumption by over 50% compared with the existing system, equivalent to a reduction of 7,000 tonnes of carbon emissions a year.
To overcome logistical and time limitations, a MiMEP approach was adopted, combining 3D laser scanning, BIM modeling, modular prefabrication, and precision installation methods. Prefabricated plant modules ensured strict quality control, minimized on-site disruptions, and accelerated construction within the tight winter replacement window.
Through advanced planning, safe transportation, and seamless integration, the project successfully delivered highperformance, sustainable cooling while setting a new benchmark for green engineering in Hong Kong.
Client
Main Contractor
Structural Engineer
Building Services Engineer
MiMEP Supplier
Highlights on Current Status
Modules Manufacturing
Project Current Status
Ongoing
No. of MiMEP Modules
60
CFA (m²)
3,011
MiMEP CFA (m²)
897
Superstructure Storeys
80 ; 42
MiMEP Storeys
7
MiMEP Area to CFA in Typical floors (%)
29.81
Commencement Date
Q2 2023
Anticipated Date of Completion
Q1 2027
MiMEP Coverage (%)
29.81
The information contained in this page has been authorised being uploaded.
Disclaimer
The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.