Chiller Plant Replacement Works at Nina Tower

8 Yeung Uk Road, Tsuen Wan
Courtesy of CLPe & Chinachem Group

The Nina Tower project showcases Hong Kong’s first Zero-Carbon chiller system, delivering 24/7 cooling across a 180,000 m² mixed-use development with a capacity of 9,300 RT. With over 50% of building energy used by MVAC, the innovative will reduce the electricity consumption by over 50% compared with the existing system, equivalent to a reduction of 7,000 tonnes of carbon emissions a year.

 

To overcome logistical and time limitations, a MiMEP approach was adopted, combining 3D laser scanning, BIM modeling, modular prefabrication, and precision installation methods. Prefabricated plant modules ensured strict quality control, minimized on-site disruptions, and accelerated construction within the tight winter replacement window.

 

Through advanced planning, safe transportation, and seamless integration, the project successfully delivered highperformance, sustainable cooling while setting a new benchmark for green engineering in Hong Kong.

Highlights on Current Status

Modules Manufacturing

Project Current Status

Ongoing

No. of MiMEP Modules

60

CFA (m²)

3,011

MiMEP CFA (m²)

897

Superstructure Storeys

80 ; 42

MiMEP Storeys

7

MiMEP Area to CFA in Typical floors (%)

29.81

Commencement Date

Q2 2023

Anticipated Date of Completion

Q1 2027

MiMEP Coverage (%)

29.81

Construction Commencement

Q2 2023

Manufacture of MiMEP Modules

In phases

Installation of MiMEP Modules

In phases

Anticipated Date of Completion

Q1 2027

The information contained in this page has been authorised being uploaded.

 

Disclaimer

The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 20.04.2026 16:50:05

About MiMEP

Multi-trade Integrated Mechanical, Electrical and Plumbing (MiMEP) is the integration of multi-trade building services components, into a single volumetric assembly of prefabricated modules, manufactured off-site in a workshop, then transported to the site for connection of modules to complete various trades of building services installations to minimise on-site works. MiMEP can integrate with structural element, architectural builders’ works and finishes (ABWF) to form an advanced assembly, such as false ceiling unit and plant room unit to enhance the productivity.

About MiMEP