Shenzhen GrandlangGroup Co., Ltd.

Shenzhen

Shenzhen GrandlangGroup Co., Ltd., referred to as "Grandlang Group" (Stock Code: 002482), is a large comprehensive listed company under Shenzhen SEZ Construction Group Co., Ltd. Founded in 1995, it is an international integrated service provider for green construction with integrated design and construction capabilities in professional projects such as building decoration, curtain walls, intellectualization, mechanical and electrical installation, and fire protection. It holds more than ten Class A qualifications including the Class A Qualification for Professional Contracting of Building Decoration Engineering. Its business scope covers residences, office buildings, large public buildings (large venues, schools, hospitals, rail transit, etc.), star-rated hotels, commercial complexes, and cultural tourism projects. It has been ranked the second among the Top 100 Enterprises in China's Building Decoration Industry for many consecutive years, and is a "Famous Brand of Shenzhen City", "Famous Trademark of Guangdong Province" and "China Well-Known Trademark". 

Key Features


With "standardised design and modular installation" as the core, it integrates the advantages of Guangtian's "GT Prefabrication 3.0" technology system, exhibiting four core competitiveness: "efficiency, safety, environmental protection, and flexibility", making it a benchmark solution for multi-functional utilization of small spaces. The use of prefabricated interior modules not only possesses core advantages such as excellent fire resistance, strong durability, and green environmental protection, but also achieves extended service life and efficient and convenient construction and maintenance.


“標準化設計、模組化安裝”為核心,融合廣田“GT裝配化3.0”技術體系優勢,展現出“高效、安全、環保、靈活”四大核心競爭力,成為小空間多功能利用的標杆解決方案。採用裝配式內裝模組,不僅具備防火性優、耐久性強、綠色環保的核心優勢,更實現使用壽命延長與施工、維護的高效便捷。

Contact Information

    Name: David
     
    Contact No.: 13040817885

Signature Projects

Emergency Campus of Shenzhen Third People's Hospital

Nanwan Street, Longgang District, Shenzhen

Client: Bureau of Public Works of Shenzhen Municipality
Role of the Project: Interior Decoration Construction Unit
Types of Module:  Steel 
No. of MiC Modules: 168
CFA  26,000m²
No. of Floors: Building 1:14 ; Building 2:19  
No. of Units: 84
Main Contract Period: 2024-2025
MiC Part: Fully decorated interior and exterior steel structure MiC module
Other Project features: The first fully-decorated, integrated, high-rise steel modular building in China with a high prefabrication rate. One dormitory building consists of 168 prefabricated modules, each with dimensions of 9.9mX3.9mX3.6m. It adopts a north-south differentiated structural design, with the north side being a concrete structure using prefabricated shear walls and prefabricated stairs, and the south side being a steel modular box. The middle part is tightly combined through steel structures and cast-in-place concrete truss floor support plates. This design allows the modular box to successfully break through the traditional multi-story structure height limit of 35 meters, reaching a new height of 55.15m. 

InnoCell

Science Park, Pak Shek Kok, Tai Po

Client: Hong Kong Science and Technology Parks Corporation
Your Role (AP/RSE/Design Consultant/Structural Engineer/BS Engineer, etc): Interior Decoration Construction Unit
Types of Module:  Hybrid
CFA (m²): 10,060 ㎡
No. of Floors: 17
No. of Modules: 418
Contract Period: 2019-2020
MiC Part: Fully decorated interior and exterior steel structure MiC module
Other Project features: Hong Kong's first permanent MiC building;  It adopts a north-south differentiated structural design, with the north side being a concrete structure using prefabricated shear walls and prefabricated stairs, and the south side being a steel modular box. The middle part is tightly combined through steel structures and cast-in-place concrete truss floor support plates. This design allows the modular box to successfully break through the traditional multi-story structure height limit of 35 m, reaching a new height of 55.15 m. 

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 27.02.2026 16:27:30

Adopting MiC to Build Light Public Housing (LPH) to Expedite Housing Supply

The Policy Address 2022 announced the construction of LPH. The LPH Scheme is led by the Architectural Services Department with the adoption of MiC. The Housing Bureau has selected eight sites in Tuen Mun, Yuen Long, Ma On Shan, Kai Tak, Ngau Tau Kok and Chai Wai, providing around 30,000 LPH units. The construction period takes only one to two years. Each units equipped with self-contained toilet and basic facilities such as water heater and air-con. The first batch of around 2,100 units will be completed in 2024-25 and the remaining units will be completed by phases in 2025-26 and 2026-27, so as to shorten the waiting time of public housing.

HOT TOPIC